1. The works on laying brick masonry of external and internal walls 11, 16, 17 floors are executed.
2. Completed lift mines (for six lifts).
3. Performed monolithic works on the installation of technical (25 floors).
4. Work was carried out on the arrangement of 25 floors (penthouses in height 4.5 m).
5. Student bushes for piles, for parking №2.