1. Installation of pipelines and gas boiler equipment is being carried out.
  2. The installation of aluminum windows for penthouses at the level of 24-25 floors has been completed and the installation of aluminum structures for bay windows has begun.
  3. Facade finishing work is being carried out. 2500 brackets were installed and 3500 m2 of insulation was mounted. Mounted 1200 meters guides. The installation of tiles on the facades has begun.
  4. Work has been done on the device of masonry parking -2 level.
  5. The installation of vertical risers for water supply and heating systems from the 2nd to the 25th floor has been completed.
  6. Work has been done on the arrangement of risers for household sewage in apartments from 2 floors to the roof.
  7. Installation of horizontal wiring of the heating system for apartments at the level of 13-18 floors is being carried out.
  8. Installation of electricity supply systems for apartments at the level of 17-22 floors is being carried out.
  9. Installation of pipes of low-current networks at the level of 21-22 floors is being carried out.
  10. Finishing work is being carried out on special rooms (switchboards, pump rooms, boiler room, etc.)